Source before interpretation
Project dimensions come from the developer’s published consultation pages. These establish what is proposed, not whether a prediction will come true. The environmental report and underlying assessment should be read alongside summaries.
Comparisons with stated assumptions
The height study uses a linear 0–200m scale in its default all-stacks view and 0–70m in the building and backup-flue detail views: an illustrative 8m house, an approximately 40m building and backup-generator flues estimated up to 66m above ground (CCER, p. 10). The 26m difference is 66 minus 40. Widths, forms and flue count are schematic. The energy-centre range of 140–180m (pp. 12 and 33) is included as a distinct column of reported numerical values. Its common zero is a comparison reference, not surveyed ground: the quoted passage does not specify the energy-centre height datum. These are preliminary modelling figures, not final approved heights. The football-pitch comparison uses a stated rectangular area. Neither graphic is a verified architectural view or site layout.
Power station comparison
The chart uses a linear scale starting at zero: 0–500 MW in the closer-size view, and 0–1,600 MW in the wider view. Selected UK generating plants use RWE and InterGen published capacities, checked on 25 September 2026. Cowes uses diesel fuel; Spalding Expansion is the 300 MW open-cycle plant, excluding the adjacent CCGT. Little Barford uses its dedicated operator page’s up-to-750 MW gross rating, while Didcot B is 1,440 MW net. The published figures therefore do not all use identical net/gross conventions. SDC’s approximate 200 MW proposal is shown separately. Its summary does not specify the net/gross basis. The comparison does not establish similar annual output, equipment, land area, emissions or noise.
Illustrative sound samples
The 15-second airflow, hum and pulsing examples are original synthesised audio with gentle fades. They demonstrate sound character only. They are not site recordings, modelled receptor noise, calibrated decibel levels or equal-loudness comparisons. Actual effects require site-specific assessment.
Maps and images
The developer’s published location map retains its boundaries and original legend. The masterplan is indicative. The opening image comes from page 25 of SDC’s published Stage Two visualisations pack: Photomontages B, looking southwest from Footpath CSP/35/1, power strategy scenario 1, technology solution 1B. This is the digital version of the view in the user-supplied workshop photograph. It depicts the proposal, not an existing built development. The PDF page was rendered at 3,000 pixels wide; the hero crops the page to exclude margins and the key, while a full-resolution page is linked. No AI-generated enhancement is used. The supplied booklet photograph remains linked in the sources. The printed 50 cm viewing instruction relates to the physical page; this screen display is not a calibrated visual assessment. The conceptual night graphic is not a photomontage or impact prediction.
Exploring the visualisation pack
The viewpoint explorer uses original views A–M (including D1 and D2), pages 20–82. Scenario labels follow the visible page headings. The planting comparison uses matched completion and year-15 illustrations from pages 28–29 and 44–45, holding Scenario 1, technology 1A constant. These are proposed outcomes, not before-and-after photographs. The campus diagram and alternative power layouts come from page 13. The three aligned land sections come from page 16. Map topics reproduce separate original plans with their keys; they are not registered overlay layers. Website crops remove page furniture without generating new landscape or buildings. The full source pages remain linked. Pack pages 17–18 explain viewing methodology and the limitations of extended panoramas.
What is not established here
The website reports SDC’s qualification about potential threshold exceedances in its modelled emergency-generator scenario; it does not independently predict an exceedance or establish regulatory acceptance. No prediction is made that screening will fail. The construction programme dates need clarification. Independent validation of the developer’s assessments has not been carried out for this website.