National demand for data centres is real. This page tests whether this site, at this scale, is the right answer.

01 / Employment & investment

Around 400
operational jobs.

SDC forecasts around 400 operational jobs. Here’s how that compares with the campus’s land and power.

Source
Delivering local benefitsSDC M40 Campus · Developer forecastEmployment and economic forecasts · Checked 25 September 2026Read original source ↗
162.5 m²Maximum building footprint per forecast job (65,000 ÷ 400). Excludes wider site land.
0.75 MWMaximum IT load per forecast job (300 ÷ 400). Not total facility consumption.

Ratios describe scale, not a pass or fail threshold. SDC also forecasts £198m regional contribution during construction and £3.8m local spending; these are separate measures and shouldn’t be added together.

Source
The data centre campusSDC M40 Campus · Developer proposalDimensions, generators and cooling · Checked 25 September 2026Read original source ↗
What SDC says

SDC expects employment and training opportunities, with potential partnerships, apprenticeships and careers programmes.

Source
Delivering local benefitsSDC M40 Campus · Developer forecastEmployment and economic forecasts · Checked 25 September 2026Read original source ↗
What residents should scrutinise

How many roles are new and filled locally? What binds SDC to those numbers?

02 / Claim by claim
02
Digital need & location

Why here, specifically?

What SDC says

SDC presents the campus as capacity for the UK’s digital infrastructure, close to London’s fibre routes, customers and contractors.

Source
Project overviewSDC M40 Campus · Developer photographyExisting-site aerial photograph · Checked 25 September 2026Read original source ↗
What residents should scrutinise

Which tenant, workload or latency need requires this exact site, and what alternative sites were compared and ruled out?

03
Previously used land

An old use doesn’t settle new questions.

What SDC says

The site includes landfill and former mineral extraction land, which SDC cites in support of redevelopment.

Source
Site access, transport and constructionSDC M40 Campus · Developer forecastConstruction programme and access · Checked 25 September 2026Read original source ↗
What residents should scrutinise

What open landscape and habitats exist today, and how would remediation and excavated waste be controlled?

04
Landscape screening

Planting takes years. The buildings don’t.

What SDC says

SDC proposes lower building platforms, planted embankments and retained vegetation to reduce visibility.

Source
Landscaping and green spacesSDC M40 Campus · Developer proposalBunding, planting and nature trails · Checked 25 September 2026Read original source ↗
What residents should scrutinise

What stays visible above the planting in winter, and what secures replacement planting while it establishes?

05
Environmental standards

Meeting a limit isn’t the same as no change.

What SDC says

SDC reports general air-quality compliance, with potential small threshold exceedances in the modelled 72-hour backup-generator emergency case, which it considers unlikely and acceptable. Noise modelling is still in development.

Source
Emergency emissions and mitigation qualificationsSDC M40 Campus · Developer assessment, not regulatory approvalCCER printed p. 33: possible small human-health threshold exceedances in the 72-hour emergency case, considered acceptable by the developer. Printed pp. 40–41: SCR and ammonia-slip considerations; final controls under development. · Checked 25 September 2026Read original source ↗
What residents should scrutinise

What do the results show at nearby homes, including the character of noise at night?

National need≠Demonstrated local necessity

Strategic importance doesn’t remove local effects. The consultation is where these questions get answered. Ask them

Source
The planning processSDC M40 Campus · Developer programmeDCO route and indicative timetable · Checked 25 September 2026Read original source ↗
03 / The evidence scorecard

Claims, evidence,
outstanding questions.

What’s evidenced, and what’s still to be tested.

BenefitDeveloper claim / evidenceStatusWhat is still to be tested
JobsApproximately 400 operational roles; developer forecast.ForecastDirect FTEs, new roles, local recruitment and duration.
Investment£198m regional construction contribution forecast.ForecastCalculation, additionality and geographic boundaries.
Digital infrastructureAdditional secure data-centre capacity.ProposedTenants, workloads, need and alternative sites.
TrainingPotential skills partnerships and programmes.Not yet securedFunded places, delivery partners and binding commitments.
Local spending£3.8m forecast over construction.ForecastWhat counts as local, procurement and enforceability.
Land remediationGround investigation and remediation strategy proposed.ProposedExtent of contamination, excavation controls and monitoring.
National infrastructureProject is pursuing the DCO route.ProposedSite-specific balance of benefits and residual effects.
Source
Delivering local benefitsSDC M40 Campus · Developer forecastEmployment and economic forecasts · Checked 25 September 2026Read original source ↗
Source
Environmental approachSDC M40 Campus · Developer assessment summaryAir quality, noise and ground conditions · Checked 25 September 2026Read original source ↗
Source
The planning processSDC M40 Campus · Developer programmeDCO route and indicative timetable · Checked 25 September 2026Read original source ↗