The case for this place

Useful infrastructure.
Justified here?

National demand for data centres is real. This page tests whether this site, at this scale, is the right answer.

7claimed benefits
3forecast
3proposed
1not yet committed
?legally binding if approved

Every benefit is a claim for now. Ask which would be written into legally binding commitments.

01 / Employment & investment

400 jobs.
For 65,000 m² of buildings.

SDC’s forecast of around 400 operational jobs, set against the campus’s size and power.

162.5 m²of building per job (65,000 m² ÷ 400). Excludes wider site land.
0.75 MWof computing power per job (300 MW ÷ 400). Excludes cooling.

SDC also forecasts £198m regional and £3.8m local construction spending: separate measures, not to be added together.

What SDC says

SDC expects employment and training opportunities, with potential partnerships, apprenticeships and careers programmes.

Ask SDC

How many roles are new and filled locally? What binds SDC to those numbers?

02 / Claim by claim
1
Digital need & location

Why here, specifically?

What SDC says

SDC presents the campus as UK digital capacity, close to London’s fibre routes, customers and contractors.

Ask SDC

Which tenant, workload or latency need requires this exact site, and what alternative sites were compared and ruled out?

2
Previously used land

A landfill. Always meant to become fields and woodland.

What SDC says

The site includes landfill and former mineral extraction land, which SDC cites in support of redevelopment.

Ask SDC

Why compare the campus with a landfill, rather than with the fields and woodland the site was required to become?

The record: the land has always been Metropolitan Green Belt. Planning permissions required it to be restored, and parts are already back to farmland or woodland. In 2017 the council refused a permanent waste plant here, citing harm to the Green Belt and to the site’s restoration. A planning inspector dismissed the appeal in 2019. That doesn’t decide this case, as the rules are different, but it has been tested.

Promised, then postponed.

  1. 2017Full restoration required by 31 December
  2. 2019Waste plant appeal dismissed on Green Belt grounds
  3. 2021Restoration deadline extended to 31 December
3
Landscape screening

Planting takes years. The buildings don’t.

What SDC says

SDC proposes lower building platforms, planted embankments and retained vegetation to reduce visibility.

Ask SDC

What stays visible above the planting in winter, and what secures replacement planting while it establishes?

4
Environmental standards

Meeting a limit isn’t the same as no change.

What SDC says

SDC reports general air-quality compliance, bar possible small exceedances in a 72-hour generator emergency it calls unlikely and acceptable; noise modelling is still in development.

Ask SDC

What do the results show at nearby homes, including the character of noise at night?

National need≠Demonstrated local necessity

Strategic importance doesn’t remove local effects. The consultation is where these questions get answered.

Ask these questions
03 / The evidence scorecard

Seven claimed benefits.
Which would be binding?

What’s evidenced, and what’s still to be tested.

BenefitDeveloper claim / evidenceStatusWhat is still to be tested
JobsApproximately 400 operational roles; developer forecast.ForecastDirect FTEs, new roles, local recruitment and duration.
Investment£198m regional construction contribution forecast.ForecastCalculation, additionality and geographic boundaries.
Digital infrastructureAdditional secure data-centre capacity.ProposedTenants, workloads, need and alternative sites.
TrainingPotential skills partnerships and programmes.Not yet committedFunded places, delivery partners and binding commitments.
Local spending£3.8m forecast over construction.ForecastWhat counts as local, procurement and enforceability.
Land remediationGround investigation and remediation strategy proposed.ProposedExtent of contamination, excavation controls and monitoring.
National infrastructureProject is pursuing the DCO route.ProposedSite-specific balance of benefits and residual effects.